← Back to Store

KnitPro Dreamz Fixed Circular Needles 32" (80cm) | US Size 13 (9mm)

$18.81
★ 4.2164 reviews

Product Information

ASINB0D6N7FMW1
CategoryOther
MerchantBestSource OfficeSupplies

About this item

  • The updated version of Dreamz Fixed Circular Needles is also available with the advanced Next-Gen Ultra Flex Cable , designed for greater flexibility and a smoother knitting experience.
  • Fixed Circular Needles: Crafted from FSC-certified birch wood, KnitPro Dreamz Fixed Circular Needles are lightweight and durable. Being lightweight, these needles minimize hand fatigue and are ideal for all kinds of knit-in-the-round projects.
  • Polished & Colourful: KnitPro Dreamz fixed circular needles are radiant, comfortable, and easy on the hands of the knitter. These colour-coded birch wood needles have a rich, smooth finish, and glide effortlessly through different types of yarn.
  • Go-to Choice: Notable features like handcrafted tips, flawless design, kink-free cables, and radiant colours make KnitPro Dreamz Fixed circular needles a preferred choice. An absolute must-have for beginners and expert knitters, they give hours of pleasurable knitting.
  • Available Needle Sizes: KnitPro Dreamz Fixed Circular needles are available in 20 popular sizes, ranging from US size 0 to 19 (2mm to 15mm), perfect for knitting cowls, headbands, scarves, etc.
  • Sustainable Paper Packaging: Packaged in FSC-certified recycled paper, these knitting needles prioritize sustainability with responsibly sourced, plastic-free materials to help protect the environment.

Similar Items